EKA RADITYA, DIAN (2011) PERBAIKAN SISTEM PEMBUANGAN SCRAP DI 4A-PRESS LINE PT. ASTRA DAIHATSU MOTOR. Undergraduate thesis, BINUS.
|
["document_typename_pdf" not defined]
2011-2-00690-TIAS Abstrak.pdf Download (73kB) | Preview |
Official URL: http://library.binus.ac.id/Collections/ethesis_det...
Abstract
PERBAIKAN SISTEM PEMBUANGAN SCRAP DI 4A-PRESS LINE PT. ASTRA DAIHATSU MOTOR - pemborosan, efisiensi, seven tools, investasi, BEP, waktu henti
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | 2011-2-00690-TIAS |
Subjects: | TIME MANAGEMENT |
Divisions: | Faculty of Science and Technology > School of Industrial Engineering-Astra Extension Program |
Depositing User: | Mr. Super Admin |
Date Deposited: | 14 May 2012 17:30 |
Last Modified: | 14 May 2012 17:30 |
URI: | http://eprints2.binus.ac.id/id/eprint/12643 |
Actions (login required)
![]() |
View Item |