Dita, Pravitra Ayu Kasthalisti and Andyanto, NSP and Andryan, Suhendra (2007) METODE PELAKSANAAN KONSTRUKSI BETON PRATEGANG PADA PEMBANGUNAN GEDUNG PERKANTORAN THE WESTIN JAKARTA. Jurnal Partisi, 04 (01). ISSN -
|
Text
02-Andryan-ABSTRACT.pdf Download (12kB) | Preview |
Abstract
The function of Westin Jakarta Project had changed for several times. Caused by the underdone planning of building function. In the beginning, the construction process of the project was done in 1998 by a contractor PT. Hyundai, then stopped for about 7 years because the monetary crisis in Indonesia. Then the project was reactivated in 2005, but the contractor was transferable to PT. NRC. The feature of the project construction was the use of prestress concrete on beams construction and the switching process of columns and existing beams. The method used in the pullout process of pre-tight concrete was a multistrand it is concluded that this method can be applied with special treatment.
Item Type: | Article |
---|---|
Additional Information: | 10_Volume 04 / Nomor 01 / May 2007_METODE PELAKSANAAN KONSTRUKSI BETON PRATEGANG PADA PEMBANGUNAN GEDUNG PERKANTORAN THE WESTIN JAKARTA |
Subjects: | Architectural and Civil Engineering |
Divisions: | Jurnal Partisi > Volume 04 / Nomor 01 / May 2007 |
Depositing User: | Mr. Super Admin |
Date Deposited: | 05 Jun 2012 04:54 |
Last Modified: | 30 Jan 2013 04:08 |
URI: | http://eprints.binus.ac.id/id/eprint/13303 |
Actions (login required)
![]() |
View Item |