Load Cell Test Pada Fondasi Jembatan Suramadu

Made, Suangga (2008) Load Cell Test Pada Fondasi Jembatan Suramadu. Jurnal Partisi, 05 (01). ISSN -

[img]
Preview
Text
05-Made-ABSTRACT.pdf

Download (6kB) | Preview
Official URL: http://library.binus.ac.id/Collections/jour...

Abstract

At present, Suramadu Bridge is the longest bridge in Indonesia, having 5.438 m length. The uniqueness of this bridge is the three parts which divide the bridge, those are approaching bridge, main bridge, and causeway. This bridge also provides a special lane for motorists outside of the bridge. For the feasibility test of these bridges, it requires a test to the load to verify the real carrying capacity which is able to be borne by the bridge. Article present a case of foundation which has a large dimension and carrying capacity, by the testing method that is done very limitedly; such as Statnamic and Load Cell Test, or Osterberg Cell Test. Based on the result of the Load Cell test - first phase, a decision to implement Load Test second phase is made. Because it is proposed to use a grouting on the tip of foundation, Load Cell second phase is implemented before and after the grouting. From the results of Load Cell Test second phase, it seems that the implementation of Grouting does not significantly increase the carrying capacity, but give a large contribution on the carrying capacity of friction.

Item Type: Article
Additional Information: 10_Volume 05 / Nomor 01 / November 2008_Load Cell Test Pada Fondasi Jembatan Suramadu
Subjects: Architectural and Civil Engineering
Divisions: Jurnal Partisi > Volume 05 / Nomor 01 / November 2008
Depositing User: Mr. Super Admin
Date Deposited: 05 Jun 2012 04:54
Last Modified: 01 Feb 2013 06:19
URI: http://eprints.binus.ac.id/id/eprint/13317

Actions (login required)

View Item View Item