INTEGRASI PERENCANAAN PRIORITAS DAN KAPASITAS SISTEM MRP II DENGAN SISTEM KANBAN MENGGUNAKAN PROMODEL

Budi, Aribowo and Natasari, Natasari (2008) INTEGRASI PERENCANAAN PRIORITAS DAN KAPASITAS SISTEM MRP II DENGAN SISTEM KANBAN MENGGUNAKAN PROMODEL. Jurnal Inasea, 09 (01). ISSN 1411-9192

[img]
Preview
Text
01 Budi Aribowo.docx-ABSTRACT.pdf

Download (13kB) | Preview
Official URL: http://library.binus.ac.id/Collections/jour...

Abstract

An important problem in manufacturing industry is the lack of capacity calculation in the planning of production. In addition, there are a lot of Work in Process (WIP) the production floor, subsequently increasing length of waiting time in manufacturing. The authors proposed the implementation of an integrated system of planning priorities and capacities in the MRP II system (Manufacturing Resource Planning) with the Kanban system to solve this problem. MRP II systems’ priority and capacity planning included capacity calculation to evaluate existing planning priorities, and applied Kanban system in the production floor will pull products when necessary. The actual system of Soho and Kanban system will be simulated with ProModel software to help understanding and analysis. From the results, this study concluded that with MRP II system’ priority and capacity planning, companies can plan production according to the design capacity, and the plan can be executed fairly well on the production floor with the Kanban system thereby reducing WIP and manufacturing waiting time on the production floor

Item Type: Article
Additional Information: 9_Volume 09 / Nomor 01 / April 2008_INTEGRASI PERENCANAAN PRIORITAS DAN KAPASITAS SISTEM MRP II DENGAN SISTEM KANBAN MENGGUNAKAN PROMODEL
Subjects: Industrial Engineering
Divisions: ?? journal_7 _9_Volume-09--Nomor-01--April-2008 ??
Depositing User: Mr. Super Admin
Date Deposited: 05 Jun 2012 04:54
Last Modified: 28 Jan 2013 06:47
URI: http://eprints.binus.ac.id/id/eprint/13635

Actions (login required)

View Item View Item