ANALISA PENURUNAN WAKTU PROSES BARITORI CAMSHAFT DENGAN METODE 6 STEP STANDARDIZED WORK DI PT. TMMIN

AGUNG GEDE NGURAH ARIKA DWIYANA, ANAK (2012) ANALISA PENURUNAN WAKTU PROSES BARITORI CAMSHAFT DENGAN METODE 6 STEP STANDARDIZED WORK DI PT. TMMIN. Undergraduate thesis, BINUS.

[img]
Preview
["document_typename_pdf" not defined]
2012-1-00665-tias abstrk.pdf

Download (12kB) | Preview
Official URL: http://library.binus.ac.id/Collections/ethesis_det...

Abstract

ANALISA PENURUNAN WAKTU PROSES BARITORI CAMSHAFT DENGAN METODE 6 STEP STANDARDIZED WORK DI PT. TMMIN - Baritori camshaft, Camshaft, Waktu proses, Waktu standar, stopwatch, 6 step standardized work, kerja utama (valuable work), kerja bukan utama (non-valuable work), kerja berjalan (walking).

Item Type: Thesis (Undergraduate)
Additional Information: 2012-1-00665-TIAS
Subjects: STANDARDIZATION
Divisions: Faculty of Science and Technology > School of Industrial Engineering-Astra Extension Program
Depositing User: Mr. Super Admin
Date Deposited: 03 Sep 2012 07:06
Last Modified: 03 Sep 2012 07:06
URI: http://eprints2.binus.ac.id/id/eprint/14054

Actions (login required)

View Item View Item