Gita Ayu, Ketut and Wihardi, Fauzi (2010) INFORMATION SYSTEM DEVELOPMENT FOR JOB SCHEDULING AND PROGRESS UPDATE TO PROVIDE REAL TIME INFORMATION IN SOFT GOOD ENGINEERING DEPARTMENT, A CASE STUDY. Jurnal Inasea, 11 (02). ISSN 1411-9129
Full text not available from this repository.Abstract
High variation in the types of toy produced in a multinational toy manufacturing company results in excessive variation in the types of soft good fabricated. A real-time and precise information flow from the release of the bill of materials (BOM) to the execution in the production floor is crucial in ensuring the smooth soft good mass production flow. On time production process of nondurable goods or so-called soft goods requires real time information of the progress update during the production of dolls costumes. The research is conducted to determine the most effective information system tool in catching delay and its cause of lateness in costume development process. The tool allows control of production system primarily in the input and process area and utilizes the earliest due date (EDD) sequencing method to minimize the maximum delay in the information transfer. Upon implementation, accurate and according-to-the-needs information is retrieved in real time which increases the efficiency of production process of the soft goods significantly
Item Type: | Article |
---|---|
Additional Information: | 9_Volume 11 / Nomor 02 / October 2010_INFORMATION SYSTEM DEVELOPMENT FOR JOB SCHEDULING AND PROGRESS UPDATE TO PROVIDE REAL TIME INFORMATION IN SOFT GOOD ENGINEERING DEPARTMENT, A CASE STUDY |
Subjects: | Industrial Engineering |
Divisions: | ?? journal_7 _9_Volume-11-Nomor-02-October-2010 ?? |
Depositing User: | Mr. Super Admin |
Date Deposited: | 17 Dec 2012 08:16 |
Last Modified: | 11 Apr 2013 04:13 |
URI: | http://eprints.binus.ac.id/id/eprint/15919 |
Actions (login required)
![]() |
View Item |