OPTIMALISASI WAKTU KERJA PROYEK PENYAMBUNGAN PLN DENGAN PENDEKATAN DYNAMIC/MULTISTAGE PROGRAMMING

IRWANTORO, BAYU and Hayun Anujuprana, ST, MT, Anggara (2013) OPTIMALISASI WAKTU KERJA PROYEK PENYAMBUNGAN PLN DENGAN PENDEKATAN DYNAMIC/MULTISTAGE PROGRAMMING. Undergraduate thesis, BINUS.

Full text not available from this repository.
Official URL: http://library.binus.ac.id/Collections/ethesis_det...

Abstract

OPTIMALISASI WAKTU KERJA PROYEK PENYAMBUNGAN PLN DENGAN PENDEKATAN DYNAMIC/MULTISTAGE PROGRAMMING -

Item Type: Thesis (Undergraduate)
Additional Information: 2013-1-01228-TI
Divisions: Faculty of Science and Technology > School of Industrial Engineering-Astra Extension Program
Depositing User: Mr. Super Admin
Date Deposited: 29 May 2013 15:55
Last Modified: 30 May 2013 04:59
URI: http://eprints2.binus.ac.id/id/eprint/26284

Actions (login required)

View Item View Item