PERBAIKAN SISTEM KERJA DAN ALIRAN MATERIAL PADA ASSEMBLY LINE 2 DI PT. MITSUBISHI KRAMA YUDHA MOTORS AND MANUFACTURING

SUGANDI, IBNU (2008) PERBAIKAN SISTEM KERJA DAN ALIRAN MATERIAL PADA ASSEMBLY LINE 2 DI PT. MITSUBISHI KRAMA YUDHA MOTORS AND MANUFACTURING. Undergraduate thesis, BINUS.

[img]
Preview
["document_typename_pdf" not defined]
2008-2-00473-TI Abstrak.pdf

Download (50kB) | Preview
Official URL: http://library.binus.ac.id/Collections/ethesis_det...

Abstract

PERBAIKAN SISTEM KERJA DAN ALIRAN MATERIAL PADA ASSEMBLY LINE 2 DI PT. MITSUBISHI KRAMA YUDHA MOTORS AND MANUFACTURING

Item Type: Thesis (Undergraduate)
Additional Information: 2008-2-00473-TI
Subjects: ASSEMBLY LINES
Divisions: Faculty of Science and Technology > School of Industrial Engineering
Depositing User: Mr. Super Admin
Date Deposited: 11 Jan 2012 20:07
Last Modified: 11 Jan 2012 20:07
URI: http://eprints2.binus.ac.id/id/eprint/2926

Actions (login required)

View Item View Item