NEWSBOY PROBLEM UNTUK MENYELESAIKAN MASALAH INVENTORY PROYEK NEW MODEL

Mailiani Sudjatmiko, Veronica and Ayu, K.Gita (2013) NEWSBOY PROBLEM UNTUK MENYELESAIKAN MASALAH INVENTORY PROYEK NEW MODEL. Jurnal ComTech, 04 (02). ISSN 2087-1244

Full text not available from this repository.
Official URL: http://library.binus.ac.id/Collections/journal_det...

Abstract

Product Quality Division is in charge to do testing and verification of motorcycle prior the order for mass production items needed. The testing is prepared by the testing department which sends the list of items needed to the warehouse to be ordered. 20 - 43% of the items needed for testing are delayed which drives the testing department to directly order the same parts to ensure the testing is conducted on time. Crucial parts are determined through Pareto analysis and Newsboy Problem inventory model is used as the inventory system. Based on the simulation of new model project using the proposed inventory system, up to 88% of the total cost of part loss in each project can be saved.

Item Type: Article
Additional Information: 25_Volume 04 / Nomor 02 / December 2013_NEWSBOY PROBLEM UNTUK MENYELESAIKAN MASALAH INVENTORY PROYEK NEW MODEL
Subjects: ?? subjectjournal_25 ??
Divisions: ?? journal_32_25_Volume-04-Nomor-02-December-2013 ??
Depositing User: Mr. Super Admin
Date Deposited: 03 Jul 2014 14:54
Last Modified: 03 Jul 2014 20:09
URI: http://eprints.binus.ac.id/id/eprint/30801

Actions (login required)

View Item View Item