PT XYZis a manufacturing company specializing in pressed metal parts, dies, jigs and fixtures which is equipped with high-tech equipment and qualified human resources. PT XYZ used a system of safety stock (buffer stock) of three kanban to anticipate a shortage of stock or production of raw materials in the production process. A research was done at PT XYZwhich focused on the degree of conformity between actual production planning by the state was obtained on the basis of the measurement of the product cycle, production capacity, actual production, production planning and material needs. The plan scheduling and material requirement planning used lot for lot method. It is needed to set the production scheduling with consideration of actual production plan where the production capacity of each product to be examined, namely the process of bending klem = 680 pcs/hour, brake with bending process II = 680 pcs/hour and plat with a capacity of blank process = 1.888 pcs/hour which are used the maximum production capacity. Lead time and safety stock are also considered as factors affecting the scheduling. From the result of making MRP, we found that the material ordering must consider the capacity of a coil for each item and the on hand (inventory) from the last production. The production planning proposal of this research was able to fulfil the supply as many as three kanban. In addition, the planning could increase the work productivity as well as time and cost efficiency. The MRP with lot for lot method was declared valid because it fulfilled the assumptions of MRP for some products. PT XYZis expected to plan a system of procurement of raw materials and production systems in order to meet market demand with the number of raw material orde. The company was expected to pay attention to lead time to reduce the risk of material shortages for production.

Item Type: Article
Additional Information: 9_Volume 14 / Nomor 02 / October 2013_PERENCANAAN PRODUKSI DAN MATERIAL PRODUK KLEM, BRAKE DAN PLAT DI PT XYZ
Subjects: Industrial Engineering
Divisions: ?? journal_7 _9_Volume-14-Nomor-02-October-2013 ??
Depositing User: Mr. Super Admin
Date Deposited: 03 Jul 2014 14:54
Last Modified: 03 Jul 2014 20:03
URI: http://eprints.binus.ac.id/id/eprint/30902

Actions (login required)

View Item View Item