CRITICAL PATH METHOD PROYEK KONSTRUKSI RUANG OPERASI PT. BESINDO MEDI SISTEM (STUDI KASUS : RS SURODINAWAN, MOJOKERTO)

SEPTA, REYSICCA and TANOTO, YESSIKA and KRISTY, REGINA (2010) CRITICAL PATH METHOD PROYEK KONSTRUKSI RUANG OPERASI PT. BESINDO MEDI SISTEM (STUDI KASUS : RS SURODINAWAN, MOJOKERTO). Undergraduate thesis, BINUS.

[img]
Preview
["document_typename_pdf" not defined]
2010-2-00464-TI Abstrak.pdf

Download (63kB) | Preview
Official URL: http://library.binus.ac.id/Collections/ethesis_det...

Abstract

CRITICAL PATH METHOD PROYEK KONSTRUKSI RUANG OPERASI PT. BESINDO MEDI SISTEM (STUDI KASUS : RS SURODINAWAN, MOJOKERTO) - Project konstruksi, tepat waktu, anggaran biaya, critical path method, critical path, crash program, pengendalian proyek

Item Type: Thesis (Undergraduate)
Additional Information: 2010-2-00464-TI
Subjects: CIVIL ENGINEERING
Divisions: Faculty of Science and Technology > School of Industrial Engineering
Depositing User: Mr. Super Admin
Date Deposited: 11 Jan 2012 20:15
Last Modified: 11 Jan 2012 20:15
URI: http://eprints.binus.ac.id/id/eprint/5861

Actions (login required)

View Item View Item