IMPLEMENTASI SISTEM DEPO PENGIRIMAN PART DARI SUPPLIER KE PT. ASTRA DAIHATSU MOTOR ASSY PLANT

AHMAD WIDODO, RIZKY (2010) IMPLEMENTASI SISTEM DEPO PENGIRIMAN PART DARI SUPPLIER KE PT. ASTRA DAIHATSU MOTOR ASSY PLANT. Undergraduate thesis, BINUS.

[img]
Preview
["document_typename_pdf" not defined]
2010-2-00483-TIAS Abstrak.pdf

Download (11kB) | Preview
Official URL: http://library.binus.ac.id/Collections/ethesis_det...

Abstract

IMPLEMENTASI SISTEM DEPO PENGIRIMAN PART DARI SUPPLIER KE PT. ASTRA DAIHATSU MOTOR ASSY PLANT - Depo, PV, NPV, IRR, Profitability Index dan Payback Period

Item Type: Thesis (Undergraduate)
Additional Information: 2010-2-00483-TIAS
Subjects: FEASIBILITY STUDIES
Divisions: Faculty of Science and Technology > School of Industrial Engineering-Astra Extension Program
Depositing User: Mr. Super Admin
Date Deposited: 11 Jan 2012 20:15
Last Modified: 11 Jan 2012 20:15
URI: http://eprints.binus.ac.id/id/eprint/5880

Actions (login required)

View Item View Item