Items where Subject is "WORK METHODS IMPROVEMENT"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: K | L | M
Number of items at this level: 3.

K

KUSNADI, KUSNADI (2007) IMPROVEMENT PROSES PENGUKURAN MOLD MENGGUNAKAN COORDINATE MEASURING MACHINES DENGAN OPTIMALISASI UTILISASI SOFTWARE PC-DMIS (STUDI KASUS DI WORKSHOP DMD, PT. AHM). Undergraduate thesis, BINUS.

L

LITAWATI, LITAWATI (2007) USULAN PERBAIKAN CARA KERJA DENGAN TANGAN KIRI DAN TANGAN KANAN DAN SISTEM KERJA 5S PADA PERAKITAN SEPATU WANITA BUCCHERI DI PT. VIGANO CIPTAPERDANA. Undergraduate thesis, BINUS.

M

MAULIDI, MAHARGIAN (2007) USULAN PERBAIKAN CARA KERJA PADA STASIUN KERJA MESIN HOPPER DI PT. FEDERAL KARYATAMA DENGAN PENDEKATAN ILMU ERGONOMI. Undergraduate thesis, BINUS.

This list was generated on Fri Aug 17 23:55:46 2018 WIB.